STEM Addition, W.F. West High School

$0.00

Location: Chehalis, Washington

Date: 2017

Square Feet: 16,500 SF

Project Cost: $4.9 Million

Project Keyword: STEM Addition, Addition, PreK-12, Education

Project Description:

The goal of KMB designed STEM facilities is to create spaces that are highly flexible, encourage collaboration, and community building. The design of Chehalis W.F. West High School has embraced this design philosophy. KMB has provided schematic design and design development services which have included structural, mechanical (HVAC, plumbing) and electrical engineering.

 